WINKO APPSales & Main workspace
Sign in required
Saved in this browser
Step 1 of 2

Quotation Setup

Customer, tank configuration and live BOM readiness in one place.

SETUP READINESSChecking current quotation…

1. Customer & Project

2. Tank Details

Tank Construction

No excludes the roof assembly, manhole and air vent.
Accessories

Access

Tank Accessories

Tank Lines

Add more tank sizes or adjust quantity here. These lines are carried into the quotation automatically.

Custom Items

Add customer-requested products, accessories or services before creating the quotation.

ItemDescriptionQtyUnit PriceAmountAction
Custom items totalRM 0.00
More Tank Options

Most quotations only need the fields above. Use these options for thickness, manhole or technical exceptions.

Quotations

All quotation records, approval states and saved snapshots.

Approval Queue

Review quotation snapshots submitted by Sales.

Quotation Number Settings

Main controls the format and next available quotation number.

Quotation Number Settings

Main only
PreviewQP-26-001
1. Enter project and tank details → 2. Add tank → 3. Set prices → 4. Choose supply preset → 5. Generate quotation PDF

Tank Input

Tank Construction & Finish
Tank Accessories
Internal Partition
Partition SpecificationNone

Calculated Tank

Length Panels0
Width Panels0
Height Panels0
Wall L11
Wall L21
Wall L30
Wall L40
Total Wall Levels2
Roof Panels0
Base Panels0
Total Wall Panels0
Partition Panels0
Compartments1
Total Panels0
BOM Approval StatusChecking
Critical Unverified Items0
Tank Volume0 ft³
Original Excel formula mode
No verified stay layout

Project Information

Quotation Tank List

BOM Review
Quotation—
Customer—
Project—
Tank—
BOM StatusReview required
Verified0
Formula0
Scaled / Preliminary0
Manual Overrides0
Missing Prices0
Production approval requiredScaled critical items must be reviewed before Factory BOM export.
Reference mode: The canonical index BOM uses verified geometry and approved exact references. Desktop work-order schedules are available as cross-checks and are applied only when a complete compatible BOM family is present; panel schedules remain reference metadata because their A/B/C labels are not interchangeable with roof, base and wall panel rows. Factory 5′-7″ / 5′-8″ / 68″ stay labels are normalized to the approved angle-stay families; the separate 5/8 × 1½ BNW fastener remains unchanged. Ambiguous or partial work-order entries stay marked for confirmation.
Item NameQtyPriceTotal
Complete customer and project information first Required fields: Customer Name, Project Name, Quotation Reference, Prepared By and Date.

Customer Details

Project Details

Customer Quotation History

Select or type a customer

History is matched by customer name, email or telephone.

Total Records0
Total QuotedRM 0.00
Latest Quotation—
Last Activity—

Customer Notes & Requirements

Save payment preferences, site conditions, preferred specifications, previous issues, and follow-up details for this customer.

PRICE DATABASE

Main-only shared pricing. Edits remain local until Save All Changes is pressed.

Panel market prices are entered per 4 ft × 4 ft panel. The six thickness entries below are used as a fallback for matching BOM panel rows when no item-specific price is configured.

Active canonical BOM items are registered automatically. Missing fasteners use the WINKO RM1 standard; every other missing item is RM0 and requires Main pricing before final quotation.

LOCAL
Total Items0
Configured Prices0
Missing Prices0
Price SourceEMPTY
Last SyncNever
GroupItemBOM CategoryUnitUnit PriceCurrencyStatusSourceUpdatedAction

BILL OF MATERIALS

Production material schedule generated from the selected tank configuration

Reference—
Date—
Prepared By—
Project—
Tank Size—
Tank Quantity1
BOM Status—
No.ItemQtyQC

BOM Price Audit

Every generated BOM item is checked against the shared price database before submission or export.

Checking prices…
TankBOM itemQtyPriceSourceLast update

BOM pricing readiness

Required BOM prices are checked automatically. Item prices remain restricted to Main.

Checking prices…

Quotation Preset

Additional Costs

Automatic from Installation Required and Main pricing.
Automatic from Transport Required and project location.

Selling Price

Quotation Summary

Material CostRM 0.00
Total CostRM 0.00
Selling Before SSTRM 0.00
SSTRM 0.00
Final QuotationRM 0.00

Quotation Tank Items

Add, edit or remove the tank lines shown in the quotation preview.

Additional Customer-Requested Items

Add optional products, accessories, services or variation items. Each entry appears as a separate numbered line in the quotation.

ItemDescriptionQtyUnit PriceAmountAction
Additional items totalRM 0.00

Yellow fields below are editable before printing. Internal BOM costs are not shown in the printed quotation.

Editable Quotation Description

JUTARAMA INDUSTRIES (M) SDN. BHD. (749861-V)

No. 19, Jalan Mega 2/1, Kawasan Perindustrian Mega 2, 43500 Semenyih, Selangor, Malaysia.

Tel: (60)-8727 7540     Email: sales@winko.my     Web: www.winko.my

Customer: Address: Attention:
QUOTATION
Date: Our Ref: Tel: Email:
Project:

With reference to your enquiry, we are pleased to provide our quotation for the following tank:

RE: SUPPLY, DELIVER AND INSTALL PRESSED STEEL TANK / FRP WATER TANK
ItemDescriptionUnit Price
(RM)
Tank QtyAmount
(RM)
1
Comply to SANS 10329:2020 Approved by SIRIM & SPAN

a) Thickness:    Roof:    Base:    Wall L1:    Wall L2:    Wall L3: b) Ladders: c) Water Level Indicator: d) e)
0.00 1
0.00
SST 0%
0.00

0.00
Exclusion
  • Float valve chamber or top sumps.
  • Flanges, nozzles, pipes, vortex, valves, electrode sensor, pumps and filter.
  • Scaffolding, unloading and hoisting of materials.
  • HIRARC, permit application, medical test and site safety supervisor.

Terms & Conditions

Quotation validity: Payment terms: Delivery terms: Delivery lead time:

We trust that our quotation meets with your expectations. Should you have any further queries, please do not hesitate to contact us. We thank you for the opportunity to quote. Best Regards & Thank you. JUTARAMA INDUSTRIES (M) SDN BHD

Scope of Supply

  1. Standard tank accessories such as bolt, nut, washer, foam tape, air vent, 600 × 600mm access manhole, internal stays and brackets, internal and external ladder, and water level indicator, subject to manufacturer’s standard and items mentioned in this quotation.
  2. Pipe-hole opening at factory, excluding flange. Pipe-hole opening on site will incur additional charges.

Excluded from the Supply

  1. Float valve chamber or top sump.
  2. Flanges, nozzles, pipes, valves, vortex, electrode sensor, pumps and filter.
  3. RC works and RC plinths.
  4. Scaffolding and safety platform for installation.
  5. Unloading, shifting and hoisting of materials at site.
  6. Safety training courses, safety equipment and medical tests required for installation.
  7. Design calculation report, subject to additional charges if requested.
  8. Water tank cleaning after installation.
  9. Water supply for testing.

Notes

  1. Tank shall sit on RC supports/plinths designed and provided by others.
  2. RC plinths must be level with maximum tolerance of ±3mm.
  3. Leak testing should be completed within three months after installation to maintain foam-tape quality.
  4. The customer is responsible for site security of delivered materials. Missing items will be replaced at additional cost.
  5. The customer shall provide manpower and equipment for unloading, transferring and hoisting materials.
  6. The customer shall ensure RC plinths are level before calling for delivery and installation.
  7. For elevated tanks, the customer shall provide suitable working-at-height equipment, including boom lift, crane, scaffolding and safety platform.
  8. Additional charges apply to excessive or additional work-site requirements not disclosed before quotation or order confirmation.
  9. Delivery and installation working hours are Monday to Saturday, 8:00am to 5:00pm. Work outside these hours or on public holidays is chargeable.
  10. Delivery and installation shall be completed within six months after PO receipt. Extensions are subject to price revision and storage charges.
BOM TotalRM 0.00

Quotation closing and title: The exported PDF now shows QUOTATION inside a full-width bordered box. The closing message, company name, prepared-by name and extra contact text can be edited before export.

Saved locally