BILL OF MATERIALS
Production material schedule generated from the selected tank configuration
| No. | Item | Qty | QC |
|---|
Customer, tank configuration and live BOM readiness in one place.
Add more tank sizes or adjust quantity here. These lines are carried into the quotation automatically.
Add customer-requested products, accessories or services before creating the quotation.
| Item | Description | Qty | Unit Price | Amount | Action |
|---|
Most quotations only need the fields above. Use these options for thickness, manhole or technical exceptions.
All quotation records, approval states and saved snapshots.
Review quotation snapshots submitted by Sales.
Main controls the format and next available quotation number.
| Item Name | Qty | Price | Total |
|---|
History is matched by customer name, email or telephone.
Main-only shared pricing. Edits remain local until Save All Changes is pressed.
Panel market prices are entered per 4 ft × 4 ft panel. The six thickness entries below are used as a fallback for matching BOM panel rows when no item-specific price is configured.
Active canonical BOM items are registered automatically. Missing fasteners use the WINKO RM1 standard; every other missing item is RM0 and requires Main pricing before final quotation.
| Group | Item | BOM Category | Unit | Unit Price | Currency | Status | Source | Updated | Action |
|---|
Production material schedule generated from the selected tank configuration
| No. | Item | Qty | QC |
|---|
Every generated BOM item is checked against the shared price database before submission or export.
| Tank | BOM item | Qty | Price | Source | Last update |
|---|
Required BOM prices are checked automatically. Item prices remain restricted to Main.
Add, edit or remove the tank lines shown in the quotation preview.
Add optional products, accessories, services or variation items. Each entry appears as a separate numbered line in the quotation.
| Item | Description | Qty | Unit Price | Amount | Action |
|---|
Yellow fields below are editable before printing. Internal BOM costs are not shown in the printed quotation.
No. 19, Jalan Mega 2/1, Kawasan Perindustrian Mega 2, 43500 Semenyih, Selangor, Malaysia.
Tel: (60)-8727 7540 Email: sales@winko.my Web: www.winko.my
With reference to your enquiry, we are pleased to provide our quotation for the following tank:
| Item | Description | Unit Price (RM) | Tank Qty | Amount (RM) |
|---|---|---|---|---|
| 1 |
Comply to SANS 10329:2020 Approved by SIRIM & SPAN a) Thickness:
Roof:
Base:
Wall L1:
Wall L2:
Wall L3:
b) Ladders:
c) Water Level Indicator:
d)
e)
|
0.00 | 1 |
0.00
SST 0%
0.00
0.00 |
We trust that our quotation meets with your expectations. Should you have any further queries, please do not hesitate to contact us. We thank you for the opportunity to quote. Best Regards & Thank you. JUTARAMA INDUSTRIES (M) SDN BHD
Quotation closing and title: The exported PDF now shows QUOTATION inside a full-width bordered box. The closing message, company name, prepared-by name and extra contact text can be edited before export.